Judgment Search

Downloads

Click on one of the following to view and/or download the relevant document:

Alphabetical Index of all judgments on this web site as at 1 October 2022

Index by Dioceses of 2022 judgments on this web site as at 1 October 2022

Reordering

The vicar and churchwardens sought a faculty to reorder the west end of the church by extending the west gallery to the north and west aisles, to introduce an accessible WC below the north-west corner of the extended gallery and enhance the existing catering facilities and musicians’ area. They also proposed introducing speakers into the chancel and the making good of tiles in the floor at the front of the church. The Victorian Society was a party opponent. The Chancellor was satisfied that "any prejudice to the architectural integrity is outweighed by the pastoral and liturgical benefits and applying the balance of probabilities the Petitioners have made out their case." He accordingly granted a faculty.

The petition proposed a substantial reordering, to include: replacement of the remaining pews and some green upholstered chairs with metal framed chairs upholstered in neutral-coloured fabric; the lowering of the timber pew platforms to create a level floor in the nave; the removal of some of the chancel furniture; new lighting and audio-visual equipment; and various repairs. The Chancellor granted a faculty for the majority of the items, but was not prepared for the lectern and reader's desk to be removed, being part of the church's set of liturgical furniture. He also required that once the worn carpet on the chancel step had been removed, the step should remain uncovered.

Proposed reordering works included re-ordering the replacement of the current heating system, the replacement of the pews with chairs, the installation of new flooring, the installation of a new kitchen and disabled toilet facilities, the improvement of access for those in wheelchairs and the converting of the warden`s pews at the back of the nave into cupboards. The purpose of the re-ordering of the Church was to open up the Church for community use, as part of its outreach to the mainly Muslim community in the parish. The Chancellor was satisfied that the reordering would be a major public benefit outweighing any harm resulting from it.

A major reordering of the Grade I church was proposed, including: a new timber floor with under-floor heating; a new ringing floor and glass screening to the tower; replacement of the pews with light-weight metal-framed chairs with wooden seats and backs; kitchenette and storage facilities; new lighting and audio-visual equipment. The Chancellor granted a faculty, being satisfied that the petitioners had made a good case for improving the church and its usability for both church and community use, in order to prevent further decline in the use of the church.

There were proposals for reordering and the objector objected to the moving of the tombs of two bishops who were founding members of the Community, the levelling of the floor, the provision of heating and lighting, and the removal of the choir stalls and screen. The Chancellor directed the issue of a faculty for all the proposals, apart from the moving of the two tombs.

Extensive reordering was proposed, including an extension to the church;a mezzanine floor and glazed screen within the church; and the replacement of pews with wooden chairs. There were four parties opponent and the Victorian Society submitted a written objection. The Chancellor granted a faculty subject to conditions (inter alia) that the stone floor should not be covered with wooden flooring, and the poppy-headed stalls should be retained.