The petition contained substantial reordering proposals for the Grade I listed church, including new heating; an audio-visual system; electrical works; replacement of pews with chairs; disposal of the pulpit; relocation of the choir stalls and organ; and works to the floor. The Chancellor granted a faculty.

Since 2000, the church of St. Michael (now annexed to St. Mary the Great) has undergone major reordering to create a cafe and meeting rooms in the nave, with the chancel left as a worship area separated from the nave by a glass screen. The church now sought a faculty to remove the remaining pews from the chancel, raise the floor level and replace the pews with Howe 40/4 seats, to enable the building to be used more effectively for the community which the church serves. The Victorian Society objected to the removal of Victorian fittings. The Chancellor determined that there was a strong justification for carrying out the proposals and granted a faculty.

The chancel of the church is only used for daily prayer and for fortnightly coffee mornings. The works proposed were the introduction of radiators and additional carpeting, to make the chancel more comfortable on the occasions when it is used. It was also proposed to create a new bell-ringing floor in the tower, in order to create a disabled toilet and kitchen at the base of the tower. There were letters of objection from two bell-ringers in respect of this item. The Chancellor decided that any impact on the bell-ringers should not outweigh the benefits of providing appropriate toilet and refreshment facilities. He accordingly granted a faculty.

A faculty was sought for extensive reordering works. Part of the reason for the works was to allow the church to be used by the local Church of England school in particular and the community in general. The Victorian Society objected to the the laying of the proposed wooden floor, which would involve removing some Victorian floor tiles. The Church Buildings Council objected to the proposed new position for the font. Both the Victorian Society and the Church Buildings Council objected to the proposed new pew benches being upholstered. The Chancellor granted a faculty, subject to a condition that the new pew benches should not be upholstered, but may have separate cushions, subject to the material being approved by the court.

Faculty granted for a major re-ordering project.

The reordering works approved by a faculty granted in 2015 had not been completed within the time allowed. A new petition was presented, requesting authority to carry out the remaining items of work. Historic England and the Society for the Protection of Ancient Buildings had concerns about certain aspects of the proposals (including the pews, the heating system, raising the floors, carpeting, the screens and the glazing). However, the Chancellor was satisfied that a case had been made for the proposals and granted a faculty.

Petition for scheme including removal of pews and pew platforms at the back of the nave and in the north aisle and the construction of a new floor at the same level as existing aisles; installation of a kitchen at the back of the north aisle; introduction of new cupboards in the north transept; introduction of new chairs; improvements to the heating system". Faculty granted. The judgment contains a discussion as to what constitutes "demolition" or "partial demolition".

An extensive reordering was proposed for a Grade II listed Victorian church. The Victorian Society and Heritage England, though not parties opponent, objected to the replacement of most of the pews with chairs, replacement of the dado panelling and replacement of the stone and wood floor with new wooden flooring. The Chancellor determined that the resulting public benefit (including liturgical freedom, pastoral well-being, opportunities for mission, and putting the church to viable uses that were consistent with its role as a place of worship and mission) would outweigh any harm that would be caused by the changes.

The original stone floor of the church was on a slope and the pew bases were at different heights. The proposal was to remove the pews and pew bases and install a new floor ‘floating’ above the original floor, to create a smooth, flat surface. The Chancellor granted a faculty, subject to the condition that the choice of chairs to replace the pews was to be overseen by the acting Archdeacon.

A proposed reordering of the church included: removal of all the pews from the nave and side aisles; creation of a raised level floor throughout with underfloor heating; creation of 'pods' within the south and north aisles to house an office, kitchen and meeting room space above and chair storage; four WCs; relocation of the font; glazing in of the south transept chapel; glazed draught lobby. There were local objections and objections from some of the amenity societies. The Victorian Society made a formal objection. They objected to the pods, the removal of the pews, the raising of the floor, the impact loss of the removal of the chancel step, the underfloor heating above the columbarium , the glazing of the memorial chapel. The Chancellor granted a faculty: ‘I have, of course, considered the St Alkmund, Duffield test.  Are these “exceptional circumstances” where the public benefit outweighs the level of harm … It is with a somewhat heavy heart that I have to find that the needs of the parish and its current congregation are such that that test is made out.’