Reordering

A faculty was sought for reordering, which included works to the south porch and the west end of the nave of the Grade I listed church, including the repositioning of three rows of pews and adjustment of floor levels. The Chancellor granted a faculty

The Vicar and Churchwardens sought a faculty to authorise a substantial reordering of the church. This judgment deals with the first phase: replacement of pews with chairs, the levelling/replacement of the floor, the construction of a chancel dais, and the installation of two toilets, one of which will be accessible. Initial consultation with, and the views of, the Diocesan Advisory Committee, Historic England, the Church Buildings Council and the Victorian Society had been on the understanding that the proposed replacement chair would be an all wood 'Theo' chair, but when the petition came before the Chancellor the petitioners had chosen instead a metal-framed, upholstered 'SB2M' chair. The Chancellor approved in principle all the items, but was not prepared to approve the SB2M chair without further consultation taking place with the before-mentioned bodies and a further opportunity for the petitioners to consider an alternative chair or make a stronger case for the SB2M chair.

The Vicar and Churchwardens of the unlisted church sought a faculty to remove the chancel and sanctuary furniture (with the exception of the Holy Table); the removal of a row of pews at the east end of the nave; the creation of a new raised floor (to be carpeted); the installation of underfloor heating; the installation of additional lighting in the chancel; and the replacement of the electronic organ console with a new one in a different position. The Twentieth Century Society objected to the removal of the choir stalls and the Communion rail. The Chancellor granted a faculty, subject to the Communion rail being retained, but moved to a position further east.

A re-ordering project included the removal of all of the nave pews and their replacement with chairs; the installation of a new kitchenette and chair store at the west end of the building; the relocation of the font; and replacement of the dangerous wooden pew platforms with a simple engineered timber floor. The Chancellor refused to grant a faculty: "... the circumstances and needs of the parish relied upon at present do not justify the changes sought because those needs can be met with a less harmful scheme."

The petitioners sought a faculty for a re-ordering of the chancel and north aisle, to include work to the floor, the removal of the choir pews and the relocation of some solid oak screens from the chancel to improve sight lines. The amenity bodies, for the most part, did not approve of the removal of the choir pews and relocation of the screens. The Chancellor found that, on balance, the public benefit would outweigh the likely harm that would ensue from the proposals and that it was therefore appropriate that a faculty should issue.

The proposed works included the installation of four toilets and a foldaway servery at the east end of the north aisle of the Grade I listed church. The works required the removal of 18 pews with associated pew platforms, together with the removal of central heating and pipework from the pews. The floor would be excavated and a new floor laid with underfloor heating installed. Two memorial features would need to be relocated. The Victorian Society, whilst accepting that some pews needed to be removed, regarded 18 as too many. The Chancellor was satisfied that the petitioners had made a good case for the proposals, which would provide some much-needed basic facilities, and granted a faculty.

The proposals for the Grade I listed church included the removal of the fixed pews in the nave, north aisle and choir, and their replacement with new moveable pew benches; also, the installation of underfloor heating. The Commissary General granted a faculty, but expressed concern that a contract had been signed with the contractor before the petition had been referred to her.

It was proposed to create space in the nave, to allow for a wide range of worship, social and cultural activities in the Grade I church. The works included removing 17 pews (some from the nave and some from the Lady Chapel); levelling the floor; moving the font from near the south door to the Lady Chapel; improving the layout of the chancel by the removal of some of the pews; removal of the 1944 communion rail; conversion of the Lady Chapel altar to allow the storage of altar linen; and the creation of new cupboard storage space. The Chancellor was not satisfied that a good case had been made for the moving of the font from near the south door, nor for removing the pews from the Lady Chapel, but he granted a faculty for the other items.

A major reordering was proposed for the city centre church, which was in poor repair and little used, with a view to improving it for worship and attracting more community use. The works proposed a new entrance into the High Street (making it more accessible - the existing access being from Fish Street), replacing the kitchen, floor levelling, underfloor heating, new lighting and a new extension to house new toilets. The Society for the Protection of Ancient Buildings and the Victorian Society questioned the need to remove the east window for the insertion of the new doorway. The Chancellor considered, however, that a new large entrance would require the existing window opening and the stone panel beneath. He granted a faculty for all the works. He was satisfied that the works would "meet a clearly identified need, and that this outweighs any incidental loss of historic fabric or significance that may occur."

The proposal was to remove the worn Victorian tiles at the west end of the nave, apart from those around the font, and to replace them with Cadeby limestone paving to match the paving laid to replace the Victorian tiles in the remainder of the nave 20 years previously, when the Parochial Church Council was unable to replace all the tiles in the nave. Heritage England and the Victorian Society objected. The Chancellor was satisfied that any harm to the significance of the church as a building of special architectural or historic interest would not be serious, and he accordingly granted a faculty.