Judgment Search

Downloads

Click on one of the following to view and/or download the relevant document:

Alphabetical Index of all judgments on this web site as at 1 October 2022

Index by Dioceses of 2022 judgments on this web site as at 1 October 2022

Reordering

The petition proposed an extensive reordering of the Grade II late Victorian church, which would "provide a more flexible space, improved facilities, proper disabled access, proper facilities for families and children, modern heating, modern lighting and a more attractive physical environment to develop the Parish's mission." The Chancellor granted a faculty for the proposed works, with the exception of the proposal to cover all the Victorian tiles in the nave with a wooden floor. The Chancellor stated that he would deal with the issue of the floor by way of an addendum to the judgment, after the parish had had a further opportunity to discuss the matter with the Victorian Society, who had objected to all the tiles being covered.

The petition related to the south transept of the Grade I church and the installation of underfloor heating beneath a new stone floor; the provision of a discreet tea point; and the introduction of heritage boards. The historic memorial slabs laid into the floor would be left in situ, covered by the heating elements and the new floor. The Society for the Protection of Ancient Buildings entered an objection and became a party opponent. The Chancellor dismissed the petition. He took the view that the proposals were unlikely to achieve what the parish seemed to want, namely, to heat the whole church which is ‘intolerably cold’ for several months of the year. The proposed underfloor heating in the south transept would only provide a partial solution, and one which would be largely compromised due to the inability to isolate the south transept as a sealed environment.

The petitioners wished to replace all the nave pews with chairs, level the floor and install underfloor heating and carpet the nave. The Chancellor granted a faculty.

The proposals were to replace the pews with metal-framed, upholstered chairs; removal of the clergy stalls; and alterations to floor levels and the heating installation. The Victorian Society indicated that it would not oppose the removal of the pews if appropriate wooden, unupholstered chairs were to be provided by way of replacement. A private objector objected to the removal of the clergy stalls and the pews. The Deputy Commissary General dismissed the petition. He determined that the removal of all of the Victorian pews would adversely affect the character of the Victorian church. He also did not consider that the replacement steel-framed, upholstered chairs would be likely to be an appropriate replacement for the pews in this particular church, if the pews were to be removed.

The petitioners wished, amongst other proposals for re-ordering, to remove the choir stalls from the chancel and level the floor, and also remove the Victorian chancel screen, in order to make the church more adaptable for worship, concerts and other uses. The Victorian Society objected to the removal of the chancel screen. Faculty granted.

A reordering scheme involved pews, platforms, the floor, the pulpit, a dais, a toilet, new heating and lighting, a kitchen, new chairs and storage facilities. The Chancellor granted a faculty, subject to conditions.

The proposed works included: (1) repair, replace and treat rotten and infested roof timbers and beams and floor supports and floors; (2) create a ramped disabled access adjacent to the main door; (3) create a disabled toilet within the disused south porch; (4) permanently remove some pews to create additional space for movement around the church and disabled/wheelchair access; and (5) create a larger family-friendly pew area at the rear of the south aisle by the removal of two pews. There were no objections. The Chancellor was satisfied that the proposed works would not result in any harm to the significance of the Grade II* church as a building of special architectural or historic interest, and accordingly granted a faculty.

The area around the font of the Grade I church consisted of sandstone flags, which over time had become very worn and had been patched with slate and concrete. The proposal was to relay the area with stone to match the existing stone around it, and to re-locate the slate to the south side to complete the paving of the south aisle in slate, all but the west end of that aisle already being paved in slate. The Society for the Protection of Ancient Buildings objected to the proposal, preferring to see further patch repairs. Having inspected the floor, the Chancellor was satisfied that the proposed work was necessary in the interests of safety from trip-hazards, and being satisfied also that the work would not result in harm to the significance of the church as a building of special architectural or historic interest.

The proposed works included: glazed frameless inner doors; a new limestone floor with under-floor heating; the removal of a plywood ceiling, the oak reredos on the east wall, 1950s pews, a replacement organ, lighting and cables; the provision of new lighting and projection facilities; the introduction of chairs; and the construction of a freestanding ‘extension’ building in the churchyard. Five objectors did not wish to be parties opponent. The Deputy Commissary General deemed the changes wholly appropriate and granted a faculty.

The proposals were for a major reordering of the Grade II* church, which would cost over £500,000. There were seven parties opponent. The proposed works included the replacement of the nave pews with oak chairs; replacement of the Victorian tiles in the nave with sandstone flooring; the replacement of the existing vestry and boiler room with a new extension to house a parish room, toilet and kitchen; the provision of a servery; and other items to which there were no objections. Notwithstanding the objections, the Chancellor granted a faculty, being satisfied that the harm to the building would be modest, that the justification for the works was strong, and that the public benefit would outweigh any harm caused to the building.