Judgment Search

Downloads

Click on one of the following to view and/or download the relevant document:

Alphabetical Index of all judgments on this web site as at 10 September 2024

Judgments indexed by Diocese:
2023 Judgments
2022 Judgments
2021 Judgments

Churchyards

Display:

The incumbent applied for a Faculty to authorise him to enter into a deed of release of rights to light on two sides of a church, in order to allow a developer to carry out development on adjoining land, 'subject to "the Church" being paid £20,000'. The Chancellor decided that an Incumbent had no power to grant a legal easement, and therefore no power to enter into a deed of release of an easement. However, the Chancellor said that the matter could be dealt with by "the incumbent licensing the construction on land adjoining the church of a building which will obstruct the light to the church".

The Chancellor granted a faculty to permit the installation of external floodlighting. The judgment contains a discussion of the effect of floodlighting on the carbon footprint of the church.

Under the authority of a faculty granted in March 2021, the sale of a piece of surplus land adjoining the church was to be sold, together with a piece of land owned by the diocese, to a housing developer who proposed building nine houses. In September 2021, a further faculty application was made for permission to create a temporary compound for the developer on part of the churchyard where there were no marked graves. A parishioner objected to the proposal and became a party opponent. His main objection was that this would be an inappropriate  and disrespectful use of part of the consecrated curtilage of the church set aside for burials. Whilst expressing some sympathy for the objector's point of view, the Chancellor considered that, subject to there being a sufficient need for the compound, and adequate safeguards being put in place to protect existing graves, it was appropriate to grant permission for a limited period of 18 months, subject to conditions requiring no part of the compound to be within 5 metres of any marked graves, and subject also to surface reinstatement works being carried out by the developer at the end of the development.

In 2008, a faculty had been granted for the demolition of a building in the churchyard and the construction of an extension to the church, which had necessitated the exhumation of 154 sets of skeletal remains (the ‘Fewston Assemblage’) which were removed from the graveyard during excavations for the erection of the Washburn Heritage Centre. A new petition was presented in 2016, seeking authority to reinter the skeletal remains in the churchyard and the erection of three memorials to record the reinterments. Whilst noting that the petitioners in 2008 should have applied for a Ministry of Justice licence, as the remains had not immediately been reinterred in consecrated ground, the Chancellor granted a faculty for the reinterment of the Fewston Assemblage and the erection of the three proposed memorials.

The Vicar and Churchwardens sought authority to conduct a survey of, firstly, the area of churchyard added in 1926 and currently in use and, secondly, the older part of the churchyard, in order to ascertain by rodding where further burials could take place, including burials in the older part of the churchyard over existing graves. A neighbour, whose house windows looked out directly on to the older part of the churchyard, objected to its re-use and the possible disturbance of existing graves, stating that interments carried out near his windows would be distressing and affect his enjoyment of his property. He claimed that such re-use would amount to a nuisance and also blight his property. The Deputy Chancellor determined that the PCC were legally entitled to re-use old burial ground until such time as the churchyard was formally closed, and that such re-use would not amount in law to a nuisance. A faculty was granted.

Faculty Petition for various works to a redundant chapel vested in the Churches Conservation Trust and the adjoining chapelyard, including improved access within the chapelyard and into the chapel, various rainwater and foul water drainage improvements, the creation of a rubbish and recycling area, and the removal of the modern metal security gates from the entrance to the south porch and their replacement with the Victorian gates which previously hung there. There was one objector, whose objection was in respect of the replacement of the porch gates. Finding by the Chancellor that the gates, being part of the redundant chapel, were not within the Faculty Jurisdiction (though the chapelyard still was). Faculty granted for all the works.

A Faculty had been granted in 2013 for the felling of some trees in the churchyard. On the date when the contractors started work, an objection to the work was made on site, as a result of which the work was suspended. The faculty subsequently lapsed. A new petition was presented and the same objector wished to become a party opponent. The Chancellor issued directions dealing with, inter alia, (a) an allegation by the objector that the Chancellor should recuse himself; (b) an application by one of the petitioner's for an extension of time in order to respond to the objector's particulars of objection; and (c) the need for an arboricultural report. The Chancellor also directed that the Ancient Yew Group should be invited to comment on the proposals.

The Rector and Churchwardens applied for a faculty for the removal from the churchyard of a mature lime tree, due to a risk of subsidence damage to an adjoining property, as advised by their retained arboriculturist. The Chancellor granted a faculty subject to conditions which included a requirement that at least one replacement tree of a species, and at a location in the churchyard, to be approved by the archdeacon must be planted during the current, or the next, growing season after the felling of the lime tree.

During the parish priest's absence, whilst attending a course, a burial took place in the closed churchyard. Prior to his absence, the priest had told the funeral director and the family that a burial could not take place, unless in accordance with one of the exceptions in the Order in Council closing the churchyard for burials, namely: (1) where a grave had been reserved by faculty; (2) where a person could be buried in the same grave as a relative. (Also, cremated remains can be buried in a closed churchyard.) The funeral director arranged for the deceased to be buried next to the deceased's brother in a tight space between two graves. The Chancellor determined that the interment was unlawful, and could not be made lawful retrospectively by the Ministry of Justice or the court, but he decided that no action should be taken to disturb the burial or to refer the matter for police investigation.

The Vicar and a churchwarden applied for a faculty to authorise retrospectively the laying flat in the churchyard of 51 memorials which had been found to be unstable in 2015 and also to authorise the laying flat of memorial stones deemed to be unstable by a future inspection. There had been much disquiet locally about the laying flat of so many memorials in 2015, and the Chancellor was concerned that there had not been adequate notification to families who might have been contacted prior to the laying down of the memorials. However, he granted a faculty, subject to a condition that in future no memorial should be laid flat without the express approval of the Archdeacon.